| 2026-07-27 |
Read the project wiki bootstrap, evidence-linked knowledge standard, source-definition register and always-on dev-server standard. |
Selected Full / Level 7 operational conformance with Zensical full and Regulation 28-style production shell. |
| 2026-07-27 |
Checked UK legislation, ICO, NHS England, National Data Guardian and section 251/COPI primary sources. |
Established cumulative legal-layer model and direct-care versus beyond-care branches. |
| 2026-07-27 |
Checked DUAA status against ICO and legislation. |
Recorded that all DUAA data-protection provisions are in force; retained code-under-review flag. |
| 2026-07-27 |
Reviewed Standards Directory service explanation and 15 primary-care-relevant entries. |
Separated scoped mandatory floors from active technical/content ceilings; created structured standards dataset. |
| 2026-07-27 |
Reviewed Core Information Standard and GP Connect pages. |
“Maximum” defined as role/purpose-specific safe interoperability, never wholesale record exposure. |
| 2026-07-27 |
Initialized Zensical, evidence controls, Graphify 2D/3D workflow, OKF/discovery exports, Direct Upload readiness and always-on service. |
Verification results recorded in project conformance page after execution. |
| 2026-07-27 |
Independent content audit checked current information-standards authority, opt-outs, DPIA wording and GP Connect contract/product scope. |
Corrected the HSCA 2012/DUAA standards chain; added Type 1, exact ISN applicability fields and GP contractual nuance. |
| 2026-07-27 |
Reviewed official 2019 digital-first lineage, the 2025 10 Year Health Plan and impact assessments, the current 2026/27 GMS contract, planning framework, NHS App/SPR/FDP/HDRS programme material, inclusion guidance, DTAC and four digital/accessibility standards. |
Separated current multi-channel contractual duties and scoped standards from programme ambitions; mapped five distinct data routes and added time-sensitive validation gates. |
| 2026-07-27 |
Independent policy, contract/standards and repository audits challenged the digital-first expansion against current primary sources. |
Corrected the 2026 regulatory instrument, separated contract duties, narrowed the NHS App communications API, distinguished live FDP products, refined record access/standards dates and added primary equality/accessibility legislation. |
| 2026-07-27 |
Extracted every substantive commitment in the Plan’s Chapter 3 and reconciled it against the current NHS App roadmap, SPR/Bill state, proxy guidance, NICE evidence framework, medical-device guidance and NHS ambient-scribing guidance. |
Created a canonical commitment/status map; separated named tools and data routes; added HealthStore, wearable, AI, proxy, social-risk and future-platform guardrails and validation gates. |
| 2026-07-27 |
Reconciled DAPB4101’s current Standards Directory entry, ISN, requirements specification and 10 July 2026 implementation update. |
Resolved the lab-to-GP sender/receiver scope and recorded the formal-date conflict: the ISN still says 30 April 2025, while a pilot aims to complete testing/assurance by April 2027 and NHS England says full conformance will be extended without yet publishing a replacement date. |
| 2026-07-27 |
Reconciled the NHS Notify digital-first page against the current Medium Term Planning Framework, service catalogue, 2025 Directions, API/MESH flow, acceptable-use policy, transparency notice and operational channel guidance. |
Separated current addressee-specific migration requirements from service availability and sender authority; recorded App-first routing, fallbacks, delivery semantics, inclusion, time-critical, controller and opt-out constraints. |